Update Structure Fire 07/10/2023 INC#0152

Update Structure Fire; INC#0152; 03:51AM; 690 S Park View St; https://bit.ly/3JLyPpd; Westlake; Units have made good progress on the original fire building. They are starting to shut down the ladder pipe operations so they can transition to hand lines to reach the remaining fire. There is some (amount unknown) of extension into the Delta exposure (attached building on the west side). The attached 4 story apartment building on the Bravo (east) side being evacuated (number unknown), the status of possible fire extension into the structure is unknown at this time. ; FS 11; Batt 11; Central Bureau; Council District 1; AR1 BC1 BC11 BC18 BC5 CM20 CM22 E10 E11 E13 E20 E201 E203 E209 E210 E211 E220 E226 E229 E235 E26 E3 E35 E6 E9 EM1 EM11 EM13 HE1 RA10 RA11 RA3 RA6 RA811 RS3 SQ21 T1 T10 T11 T20 T26 T29 T3 T35 T9 UR3; CH7; 12 13 14 15; Margaret Stewart

Translate