The following Division 5 Permits  are issued at the Engineering Unit:

  1. Permits to erect, install or relocate any appliance, device, or system listed below when such equipment is to be used in connection with hazardous materials, hazardous waste, or hazardous plastics.

  1. Atmospheric tank exceeding 60 gallon capacity.

  2. Low pressure tank exceeding 60 gallons water capacity.

  3. Pressure vessel exceeding 60 gallons water capacity.

  4. Special vessel.

  5. Gas holder exceeding 3,000 standard cubic feet.

  6. Spray booth or spray tunnel with any dimension greater than three feet.

  7. Dip tank more than 150 gallons capacity or more than five square feet of surface area.

  8. Flow coat machine.

  9. Drying oven.

  10. Industrial oven or furnace, not otherwise specified.

  11. Industrial processing equipment, not otherwise specified.

  12. Fumigation chamber.

  13. Automatic fire extinguishing system except automatic sprinkler system.

  14. Compressed or liquefied gas manifold (stationary).

  15. Dust collecting systems.

  16. Dry cleaning equipment, not otherwise specified.

  17. Drill or redrill any oil well.

  18. Asbestos abatement.

  1. Permits to add to or alter any item, including ducting or piping connected to items listed above in Section A.
     

  2. Permits are required to conduct any of the following operations:

  1. Blasting operations.
  2. Transfer of flammable gas, liquefied flammable gas, flammable liquids or combustible liquids.
  3. Temporarily store explosives.
  4. Permits to install any central station signaling system.
  5. Permits to land any aircraft including helicopters, except for an emergency, any place other than an airport or heliport.